Panel P-2 relocated approximately 8ft north — conduit rerouting required for circuits C1, C2, C4.
Impact: adds ~24ft of 3/4in EMT and two new 90s. Coordinate with mechanical above ceiling grid.
Scope reads your revised electrical drawings and tells you exactly what changed, what it means for your scope, and how confident it is — in seconds, not hours.
How it works
Drop in the new sheet — PDF export or a phone photo of the marked-up print.
It reads clouds, deltas and callouts, then cross-references the panel schedules.
Every change, written the way a foreman would say it, with a confidence rating attached.
Why it's different
Revision-aware, not a pixel diff. Scope interprets the markup and tells you the actual scope impact.
Every change carries a confidence score. When Scope can't confirm something, it flags it instead of guessing.
Circuit and panel changes are checked against the schedules so nothing slips between sheets.
Works from a phone photo of a marked-up sheet. No desktop, no plan table, no waiting on the office.
The output
Panel P-2 relocated approximately 8ft north — conduit rerouting required for circuits C1, C2, C4.
Impact: adds ~24ft of 3/4in EMT and two new 90s. Coordinate with mechanical above ceiling grid.
Two new 20A receptacle circuits added at the east corridor, fed from P-2 spaces 14 and 16.
Impact: schedule shows spares available — verify breaker stock before rough-in.
Lighting control zone boundary appears revised near grid line C — markup is partially obscured.
Impact: unconfirmed. Flagged for manual review against the revised control diagram.
Pricing
$0/mo
For trying it on one job
$25/mo
For the working crew
$49/mo
For multi-crew shops
One missed cloud costs more than a year of Scope. Put a second set of eyes on every sheet.
Get started free