Revision intelligence for electrical

Never build off the wrong drawing again.

Scope reads your revised electrical drawings and tells you exactly what changed, what it means for your scope, and how confident it is — in seconds, not hours.

Built by electricians, for electriciansTrained on real revision setsEarly access, actively shipping

How it works

Three steps between a new revision and knowing your exposure.

  1. 01

    Upload your revised drawing

    Drop in the new sheet — PDF export or a phone photo of the marked-up print.

  2. 02

    Scope reads the revision markup

    It reads clouds, deltas and callouts, then cross-references the panel schedules.

  3. 03

    Get a plain-language breakdown

    Every change, written the way a foreman would say it, with a confidence rating attached.

Why it's different

Revision review that behaves like a second set of trained eyes.

Reads what changed, not just that something changed

Revision-aware, not a pixel diff. Scope interprets the markup and tells you the actual scope impact.

Honest about uncertainty

Every change carries a confidence score. When Scope can't confirm something, it flags it instead of guessing.

Cross-references panel schedules automatically

Circuit and panel changes are checked against the schedules so nothing slips between sheets.

Built for the field

Works from a phone photo of a marked-up sheet. No desktop, no plan table, no waiting on the office.

The output

Exactly what you get back, sheet by sheet.

scope.app / riverside-medical / E-201 · Rev 3
E-201MovedHigh · 94%

Panel P-2 relocated approximately 8ft north — conduit rerouting required for circuits C1, C2, C4.

Impact: adds ~24ft of 3/4in EMT and two new 90s. Coordinate with mechanical above ceiling grid.

E-201AddedMedium · 81%

Two new 20A receptacle circuits added at the east corridor, fed from P-2 spaces 14 and 16.

Impact: schedule shows spares available — verify breaker stock before rough-in.

E-203ModifiedLow · 58%

Lighting control zone boundary appears revised near grid line C — markup is partially obscured.

Impact: unconfirmed. Flagged for manual review against the revised control diagram.

Pricing

Start free. Upgrade when it saves you a callback.

Free

$0/mo

For trying it on one job

  • 1 active project
  • 5 sheet analyses / month
  • Confidence scoring
Start free

Contractor

Popular

$25/mo

For the working crew

  • Unlimited projects
  • 100 sheet analyses / month
  • Panel schedule cross-reference
  • Revision history per sheet
Get started

Shop

$49/mo

For multi-crew shops

  • Everything in Contractor
  • Unlimited analyses
  • Team accounts
  • Priority processing
Get started

Stop losing money on missed revisions.

One missed cloud costs more than a year of Scope. Put a second set of eyes on every sheet.

Get started free