Panel P-2 relocated approximately 8ft north (bottom-left to top-left of Office A)
Impact: all existing circuit home runs (C1, C2, C4) require rerouting from new panel location — re-measure conduit lengths for takeoff.
For electrical contractors and estimators
Comparing revisions by eye takes time, and things get missed, especially changes buried in a schedule with nothing circled on the plan. Scope compares revisions directly when you have both, or reads the markup when you only have one, and tells you what changed, what it means, and how sure it actually is.
How it works
Drop in the new sheet — PDF export or a phone photo of the marked-up print.
It reads clouds, deltas and callouts, then cross-references the panel schedules.
Every change, written the way a foreman would say it, with a confidence rating attached.
Why it's different
Revision-aware, not a pixel diff. Scope interprets the markup and tells you the actual scope impact.
Every change carries a confidence score. When Scope can't confirm something, it flags it instead of guessing.
Circuit and panel changes are checked against the schedules so nothing slips between sheets.
Works from a phone photo of a marked-up sheet. No desktop, no plan table, no waiting on the office.
Knowing exactly what changed — and how sure Scope is about it — means fewer surprises after you've already priced the job. No re-measuring conduit halfway through rough-in.
The output
Panel P-2 relocated approximately 8ft north (bottom-left to top-left of Office A)
Impact: all existing circuit home runs (C1, C2, C4) require rerouting from new panel location — re-measure conduit lengths for takeoff.
Two new 20A receptacle circuits added at the east corridor, fed from P-2 spaces 14 and 16.
Impact: schedule shows spares available — verify breaker stock before rough-in.
Lighting control zone boundary appears revised near grid line C — markup is partially obscured.
Impact: unconfirmed. Flagged for manual review against the revised control diagram.
Pricing
$15/mo
Good for occasional use
$35/mo
For the working crew
$75/mo
For teams and heavy users
| Feature | Starter | Standard | Pro |
|---|---|---|---|
| Monthly credits | 15 | 40 | 100 |
| Price per month | $15 | $35 | $75 |
| Standard analysis | 1 credit | 1 credit | 1 credit |
| Complex / dense sheet | 5 credits | 5 credits | 5 credits |
| Additional credits | |||
| Priority processing | — |
Most drawings use 1 credit. Larger or more complex sheets may use more — you'll always see the cost before it's used. Need more before your next billing cycle? Additional credits can be purchased anytime.
Secure checkout powered by Stripe. Cancel anytime.
FAQ
Scope doesn't just tell you what changed, it tells you how confident it actually is about each finding. Every flagged change gets a confidence rating (High, Medium, or Low), and when something genuinely can't be confirmed, Scope says so instead of guessing. You should always verify findings against the source drawings before acting on them.
One missed cloud costs more than a year of Scope. Put a second set of eyes on every sheet.
Get started